PERBANDINGAN KEMAJUAN PROGRES TAMBANG BATUBARA DI PT SAMANTAKA PADA BULAN JULI-AGUSTUS TAHUN 2021 DENGAN BULAN FEBRUARI-MARET TAHUN 2022
Abstract
Coal mining progress is a measurement activity that is carried out every day for as long as mining activities are carried out. The measurement of coal mining progress is carried out at the PT Samantaka mine which aims to determine the changes that occur in the mine, the progress of this mine is also carried out to determine the progress of the mine every month, both in knowing the land and remaining coal reserves and also to determine the coal production every month. the month. In addition, measuring mine progress is very important, because to find out the next mine design it is necessary to obtain a mine progress map first. Mine progress measurement to retrieve crees, toe, spot, floor and roof data. From this data, a map of mining progress and coal volume calculations can be obtained, volume calculations are usually carried out after the depiction is carried out, because volume calculations must obtain a 3D shape of coal for which volume will be calculated. The results of coal calculations are usually in the form of tonnage calculations. The results of the calculation of coal in 2021 in July and August there is a comparison of the volume of reserves with those in the stockpile is 908 tons and 2,883 tons, while in 2022 in February and March there is a volume comparison of 3,675 tons and 646 tons.
References
Berk, K. N., & Carey, P. (2007). Data Analysis with MICROSOFT EXCEL. Brooks/Cole, Cengage Learning.
EKA NINGSIH, A. R. I. N. T. I. A., Awaluddin, M., Darmo Yuwono, B., & Putra Wijaya, A. (2014). Kajian Pengukuran Dan Pemetaan Bidang Tanah Metode DGPS Post Processing Dengan Menggunakan Receiver Trimble GeoXT 3000 Series (Doctoral dissertation, Universitas Diponegoro).
Fujiawati, M. (2015). Rencana Produksi Bijih Emas Blok Ckn_1035_Xc08 Dan CKN_1040_Xc08 Di PT Cibaliung Sumberdaya Desa Mangkualam–Padasuka, Kecamatan Cimanggu Kabupaten Pandeglang, Provinsi Banten.
Hendriati ningsih, S. (2008). Aplikasi Stake-Out Titik dengan Akurasi Tinggi. Jurnal Teknik Sipil ITB, 15(2), 59-68.
Kurnia, A, M. 2015. Evaluasi Penambangan di pit 3 Berdasarkan Pengukuran Survey Kemajuan Tambang Terhadap Ritase Alat Angkut. Kalimantan Selatan.
Muda, I. (2008). Teknik Survei dan Pemetaan. Jakarta: Direktorat pembinaan sekolah menengah kejuruan.
Nugroho, R. A. (2016). PENGEMBANGAN MEDIA PEMBELAJARAN MATA KULIAH ILMU UKUR TANAH DAN PRAKTEK KAJIAN MENGOPERASIKAN TOTAL STATION TOPCON GTS 235N Series (Doctoral dissertation, Universitas Negeri Semarang).
Pohan, A. F., Nata, R. A., & Floren, R. (2017). Sejarah PT. Samantaka Batubara Desa Pauh Ranap Kecamatan Peranap Kabupaten Indragiri Hulu Provinsi Riau. Jurnal Sains Dan Teknologi: Jurnal Keilmuan Dan Aplikasi Teknologi Industri, 17(1), 18-22.
RAHMADIANSYAH, M. (2020). PERHITUNGAN VOLUME STOCKPILE BATUBARA MENGGUNAKAN METODE CUT AND FILL BERDASARKAN DATA PENGUKURAN TOTAL STATION (Doctoral dissertation, Universitas Gadjah Mada).
Subriyanto, W, T. 2015. Perhitungan Sumberdaya dan Cadangan Batubara Pada PT. Bartim Metropolitan Perkasa. Banjarmasin.
Sujiman, S. (2015). Kajian Perhitungan Cadangan Batubara Menggunakan Metode Block Model 2 Dimensi Dan Cross Section Di Software Surpac Pada Pt Tanito Harum Kalimantan Timur. Jurnal Geologi Pertambangan (JGP), 1(17), 1-14.
Syaripudin, A. (2014). Pengantar survey dan pengukuran. Jakarta: Direktorat Pembinaan SMK.
Triono, Dina Islamiah, 2014. Perhitungan Kemajuan Tambang (Progress Mining) Dengan Metode Penampang Melintang Di CV. Wulu Bumi Sakti Kec Kutai Kartanegara Prov Kaltim. Jurnal Geologi Pertambangan (JPG) Volume 2 september .
Wuryadi, D. T. (2019). PEMODELAN DAN PERHITUNGAN PREDIKSI JANGKA WAKTU VOLUME CADANGAN BATUBARA PADA SATU PIT (Studi Kasus: Kecamatan Pengaron, Kabupaten Banjar Kalimantan Selatan) (Doctoral dissertation, ITN MALANG).
Copyright (c) 2023 Ristian Mades Vieri, Desi Syafriani, Dwi Arini, Defwaldi Defwaldi
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.